Hanademi

Are digital twins transforming every operational area in mining?¿Los gemelos digitales transforman cada área operativa de la minería? · V8 Master Engine

32 slides · 23 min · 2026-08-1532 láminas · 23 min · 2026-08-15 language
ENES
theme
LightDark
view
TalkTable
brand
HanademiPlatzi
Are digital twins transformingevery operational area in mining?Made for Dorin Aliendre, by Hanademi
  1. A 3D model becomes a twin only when synchronized with actual operations.
  2. Recovery variability fell from 3.3 to 1.14 in the Quellaveco case.
  3. The priority is connecting operational decisions, not accumulating isolated models.
¿Los gemelos digitalestransforman cada área operativade la minería?Made for Dorin Aliendre, by Hanademi
  1. Un modelo 3D solo se vuelve gemelo cuando se sincroniza con la operación real.
  2. La variabilidad de recuperación bajó de 3,3 a 1,14 en el caso de Quellaveco.
  3. La prioridad es conectar decisiones operativas, no acumular modelos aislados.
A 2026 mine-planning study cut theforecast-to-reality gap from 22.3% to 4.6%Made for Dorin Aliendre, by HanademiSources: arxiv.org; seequent.com; perumin.com; repositorio.unsch.edu.pe; tesis.pucp.edu.pe; Global MiningGuidelines GroupUnitImprovement from each case's starting valueImprovement vs. starting valueAdaptive mine-planning study79% less gapBarro Alto model updates75% less timeQuellaveco recovery variability65% less variabilityAnimon mine resistance54% less resistancePeruvian underground dispatch35% more outputAsturmine resource modelling30% less time
Across six reported cases, local measures improved by 30% to 79%. The evidence does not show one synchronized twin spanning the whole mine, while four critical data domains remain fragmented.
Un estudio de planeación minera de 2026 redujo labrecha entre pronóstico y realidad de 22,3% a 4,6%Made for Dorin Aliendre, by HanademiFuentes: arxiv.org; seequent.com; perumin.com; repositorio.unsch.edu.pe; tesis.pucp.edu.pe; Global MiningGuidelines GroupUnidadMejora frente al valor inicial de cada casoMejora frente al valor inicialEstudio de planeación minera adaptativa79% menos brechaActualización de modelo en Barro Alto75% menos tiempoVariabilidad en Quellaveco65% menos variabilidadResistencia de mina en Animon54% menos resistenciaDispatch subterráneo en Perú35% más producciónModelado de recursos en Asturmine30% menos tiempo
En seis casos reportados, las medidas locales mejoraron entre 30% y 79%. La evidencia no muestra un gemelo sincronizado que abarque toda la mina, mientras cuatro dominios críticos de datos siguen fragmentados.
The words that separate a model from atwinOperational definitions used throughout the presentation.Made for Dorin Aliendre, by HanademiDigital twinVirtual representation synchronized with a real entity.DispatchSystem that assigns and coordinates equipment during operations.ThroughputAmount of material processed over a period.NPVPresent value of a project's future economic flows.Open Mining FormatOpen format for exchanging mining geometry and attributes.
These definitions avoid confusing visualization with operational control. A model can represent a mine in great detail and remain disconnected from what happens in the field. The twin begins when the real state updates the representation and that representation improves a decision.
Las palabras que separan un modelo de ungemeloDefiniciones operativas usadas en toda la presentación.Made for Dorin Aliendre, by HanademiGemelo digitalRepresentación virtual sincronizada con una entidad real.DispatchSistema que asigna y coordina equipos durante la operación.ThroughputCantidad de material procesado durante un periodo.VPNValor actual de los flujos económicos futuros de un proyecto.Open Mining FormatFormato abierto para intercambiar geometría y atributos mineros.
Estas definiciones evitan confundir visualización con control operativo. Un modelo puede representar una mina con gran detalle y seguir desconectado de lo que ocurre en terreno. El gemelo comienza cuando el estado real actualiza la representación y esa representación mejora una decisión.
A digital model cut variation in recoveredmaterial to one-thirdStandard deviation of recovery variability in traditional and optimized scenarios at Quellaveco.Made for Dorin Aliendre, by HanademiSources: perumin.com.; Digital Twin Consortium. (2020). Digital twin system interoperability framework.; link.springer.com.Unitstandard deviationTraditional mining3.3Scenario with twin1.12.9x
This is the result that makes the digital mine twin idea attractive. At Quellaveco, recovery variability fell from 3.3 to 1.14 in the optimized scenario. But a 3D model is not enough: it must remain synchronized with the real entity. Mining digitalization grows, though its depth still varies across processes.
Un modelo digital redujo a un tercio lavariación del material recuperadoDesviación estándar de la variabilidad de recuperación en escenarios tradicional y optimizado deQuellaveco.Made for Dorin Aliendre, by HanademiFuentes: perumin.com.; Digital Twin Consortium. (2020). Digital twin system interoperability framework.; link.springer.com.Unidaddesviación estándarMinería tradicional3,3Escenario con gemelo1,12,9x
Este es el resultado que hace atractiva la idea de una mina gemela. En Quellaveco, la variabilidad de recuperación bajó de 3,3 a 1,14 en el escenario optimizado. Pero un modelo 3D no basta: debe mantenerse sincronizado con la entidad real. La digitalización minera crece, aunque su profundidad todavía varía entre procesos.
Three 30%–75% mine-performance gains cannotestablish digital-model use rates in three areasMade for Dorin Aliendre, by HanademiSources: perumin.com.; seequent.com.; seequent.com.UnitCase improvement and public adoption rates identifiedMeasured improvement in individual casesBarro Alto model updates75% less timeQuellaveco variability66% reductionAsturmine modelling30% less timeEach line begins at the prior level of 100Public adoption rates identifiedGeologyExplorationProcessing plants000Count of rates with a public numerator and denominator
The evidence demonstrates technical capability in individual mines, not broad transformation: reductions reach 30% to 75%, while public prevalence remains unmeasured in three major domains.
Tres mejoras mineras de 30%–75% no establecen eluso de modelos digitales en tres áreasMade for Dorin Aliendre, by HanademiFuentes: perumin.com.; seequent.com.; seequent.com.UnidadMejora de casos y tasas públicas de adopción identificadasMejora medida en casos individualesActualización de modelos en Barro Alto75% menos tiempoVariabilidad en Quellaveco66% de reducciónModelado en Asturmine30% menos tiempoCada línea comienza en el nivel anterior de 100Tasas públicas de adopción identificadasGeologíaExploraciónPlantas de procesamiento000Número de tasas con numerador y denominador públicos
La evidencia demuestra capacidad técnica en minas individuales, no una transformación generalizada: las reducciones alcanzan entre 30% y 75%, mientras la prevalencia pública sigue sin medirse en tres áreas principales.
Updating the geomechanical model took75% less timeDigital integration at Barro Alto connected geomechanical work with operational tools.Sources: seequent.com.
Digital geology stops being a file when it enters the daily decision cycle. At Barro Alto, integration cut geomechanical model update time by 75%. That speed enables work with a representation less outdated relative to the actual ore body.
Actualizar el modelo geomecánicotomó 75% menos tiempoLa integración digital en Barro Alto conectó el trabajo geomecánico con herramientas operativas.Fuentes: seequent.com.
La geología digital deja de ser un archivo cuando entra en el ciclo diario de decisión. En Barro Alto, la integración redujo 75% el tiempo necesario para actualizar modelos geomecánicos. Esa velocidad permite trabajar con una representación menos atrasada frente a la realidad del yacimiento.
Digital deposit models cut modeling time upto 75% in commercial casesReduction in update or modeling time across 2 published mining cases.Made for Dorin Aliendre, by HanademiSources: seequent.com.; seequent.com.Unitpercentage reductionBarro Alto75%Asturmine30%2.5x
Two cases point to the same bottleneck: update time. Barro Alto reported a 75% reduction and Asturmine a 30% reduction. The tasks are not identical, but both show that digital integration can accelerate the renewal of geological knowledge.
Modelos digitales de yacimientos redujeron hasta 75%el tiempo de modelado en casos comercialesReducción del tiempo de actualización o modelamiento en 2 casos mineros publicados.Made for Dorin Aliendre, by HanademiFuentes: seequent.com.; seequent.com.Unidadreducción porcentualBarro Alto75 %Asturmine30 %2,5x
Dos casos apuntan al mismo cuello de botella: el tiempo de actualización. Barro Alto informó una reducción de 75% y Asturmine una de 30%. Las tareas no son idénticas, pero ambas muestran que la integración digital puede acelerar la renovación de conocimiento geológico.
Field observation anchors geologyA geologist consults a tablet from a rocky overlook above an exploration landscape.Sources: The evolving role of artificial intelligence in mineral exploration. magazine.cim.org.
A synchronized geological model begins with observations captured where exploration meets the ground.
La observación de campo ancla la geologíaUn geólogo consulta una tableta desde un mirador rocoso sobre un paisaje de exploración.Fuentes: The evolving role of artificial intelligence in mineral exploration. magazine.cim.org.
Un modelo geológico sincronizado comienza con observaciones capturadas donde la exploración se encuentra con el terreno.
The cases exist, but still do not reveal whatproportion of the sector has adopted twins.Available evidence could not establish: adoption rate of digital twins in mining geology andexploration. The absence of a published rate does not mean adoption equals zero.Sources: redimin.cl.; International Council on Mining and Metals. (2024). ICMM data and research resources.; Commonwealth Scientific and IndustrialResearch Organisation. (2024). Mineral resources research.
Codelco offers concrete evidence of industrial experimentation in Chile. Two divisions were running trials as of March 5, 2025. However, counting visible cases does not allow us to calculate adoption. The denominator of eligible mines and explorers is missing.
Los casos existen, pero todavía no revelanqué proporción del sector adoptó gemelos.La evidencia disponible no pudo establecer: tasa de adopción de gemelos digitales engeología y exploración minera. La ausencia de una tasa publicada no significa adopciónigual a 0.Fuentes: redimin.cl.; International Council on Mining and Metals. (2024). ICMM data and research resources.; Commonwealth Scientific and IndustrialResearch Organisation. (2024). Mineral resources research.
Codelco ofrece una señal concreta de experimentación industrial en Chile. Dos divisiones realizaban pruebas al 5 de marzo de 2025. Sin embargo, contar casos visibles no permite calcular adopción. Falta el denominador de minas y exploradoras elegibles.
Mining comminution consumes roughly 3%of global electricity.The figure dimensions the economic objective but does not measure the savingsattributable to a digital twin.Sources: Coalition for Eco Efficient Comminution. (2012). The business case for eco-efficient comminution.; OneMine | Energy Reduction ThroughEco-Efficient Comminution Strategies.
Energy makes the connection between geology, planning, and plant strategic. Mining comminution consumes approximately 3% of global electricity. A small improvement on that base can matter more than a large improvement in a secondary process.
La conminución minera consume cerca de3% de la electricidad mundial.La cifra dimensiona el objetivo económico, pero no mide el ahorro atribuible a un gemelodigital.Fuentes: Coalition for Eco Efficient Comminution. (2012). The business case for eco-efficient comminution.; OneMine | Energy Reduction ThroughEco-Efficient Comminution Strategies.
La energía vuelve estratégica la conexión entre geología, planificación y planta. La conminución minera consume aproximadamente 3% de la electricidad mundial. Una pequeña mejora sobre esa base puede importar más que una gran mejora en un proceso secundario.
With airflow at 77% of need, one redesigncut airflow resistance 54%Recorded airflow versus required and modeled mine resistance before and after at U.M. Animon.Made for Dorin Aliendre, by HanademiSources: repositorio.unsch.edu.pe.; extremominero.com.ar.Unitcfm and Ns²/m⁸Intake airflow860K1,064.4KRecordedRequiredMine resistance0.01890.00862BeforeWith proposal
U.M. Animon recorded 860,000 cfm against 1,064,377 cfm required. Modeling proposed five raise shafts and reduced resistance from 0.01888 to 0.00862 Ns²/m⁸. That cycle of measuring, simulating, and redesigning comes much closer to an operational twin than a static representation.
Con 77% del aire necesario, un rediseñoredujo 54% la resistencia al flujoCaudal registrado frente al requerido y resistencia minera modelada antes y después en U.M. Animon.Made for Dorin Aliendre, by HanademiFuentes: repositorio.unsch.edu.pe.; extremominero.com.ar.Unidadcfm y Ns²/m⁸Caudal de ingreso860K1.064,4KRegistradoRequeridoResistencia de mina0,01890,00862AntesCon propuesta
U.M. Animon registró 860.000 cfm frente a 1.064.377 cfm requeridos. El modelamiento propuso cinco chimeneas y redujo la resistencia de 0,01888 a 0,00862 Ns²/m⁸. Ese ciclo de medir, simular y rediseñar se acerca mucho más a un gemelo operativo que una representación estática.
Five planned shafts could cut airflowresistance 54% after a 19% shortfallMade for Dorin Aliendre, by HanademiSources: repositorio.unsch.edu.pe.UnitAirflow in cfm and mine resistance in Ns²/m⁸Airflow balanceRequired airflow1,064,377Recorded average airflow860,000Calculated shortfall204,37719% shortfallModeled mine resistanceInitial resistance0.01888Proposed resistance0.0086254% reduction, five shafts
Recorded airflow was about 19% below the stated requirement, while the proposed five raise-boring shafts were modeled to remove about 54% of mine resistance.
Cinco chimeneas planeadas podrían reducir 54% laresistencia tras un déficit de aire del 19%Made for Dorin Aliendre, by HanademiFuentes: repositorio.unsch.edu.pe.UnidadCaudal en cfm y resistencia minera en Ns²/m⁸Balance de caudalCaudal requerido1,064,377Caudal promedio registrado860,000Déficit calculado204,37719% de déficitResistencia minera modeladaResistencia inicial0.01888Resistencia propuesta0.0086254% de reducción, cinco chimeneas
El caudal registrado estaba cerca de 19% por debajo del requerimiento indicado, mientras las cinco chimeneas raise-boring propuestas fueron modeladas para eliminar cerca de 54% de la resistencia minera.
Adaptive planning reduced the gap from22.3% to 4.6%Gap between expectation and reality in an adaptive mining planning framework published in 2026.Made for Dorin Aliendre, by HanademiSources: arxiv.org.Unitpercentage gap22.3%Initial approach4.6%Adaptive framework
A static plan becomes outdated the moment operations change. The adaptive framework reduced the gap between expectation and reality from 22.3% to 4.6%. It also reported US$8.4 million improvement in realized NPV. The value is in recalculating, not just visualizing.
Sources
La planificación adaptativa redujo la brechade 22,3% a 4,6%Brecha entre expectativa y realidad en un marco adaptativo de planificación minera publicado en 2026.Made for Dorin Aliendre, by HanademiFuentes: arxiv.org.Unidadbrecha porcentual22,3 %Enfoque inicial4,6 %Marco adaptativo
Un plan estático envejece en cuanto cambia la operación. El marco adaptativo redujo la brecha entre expectativa y realidad de 22,3% a 4,6%. También informó US$8,4 millones de mejora en VPN realizado. El valor está en recalcular, no solo en visualizar.
Fuentes
Three studies found 2% more project valueand reduced planning errors 68%–79%Made for Dorin Aliendre, by HanademiSources: gestionrepo.unmsm.edu.pe.; sage.cnpereading.com.; arxiv.org.UnitPercent improvement reported or derivedYauliyacu compliance-gap closure+68%Joint-uncertainty schedule NPV gain+2%Adaptive planning expectation-gap closure+79%Each line starts at zero improvement
Modeling delivered its largest relative effects by narrowing gaps between plans and execution; the directly reported financial uplift was smaller at 2%.
Tres estudios hallaron 2% más valor y redujeron68%–79% los errores de planificaciónMade for Dorin Aliendre, by HanademiFuentes: gestionrepo.unmsm.edu.pe.; sage.cnpereading.com.; arxiv.org.UnidadMejora porcentual reportada o derivadaCierre de la brecha de cumplimiento en Yauliyacu+68%Aumento de VPN con programación de incertidumbre conjunta+2%Cierre de la brecha de expectativa con planeación adaptativa+79%Cada línea comienza en cero mejora
El modelado produjo sus mayores efectos relativos al reducir brechas entre los planes y la ejecución; el aumento financiero reportado directamente fue menor, con 2%.
Separate studies found modeling operationaluncertainty increased how closely workers followedplansPlan compliance potential at Yauliyacu and NPV index of a program for a copper complex.Made for Dorin Aliendre, by HanademiSources: gestionrepo.unmsm.edu.pe.; sage.cnpereading.com.; dataciencia.anid.gob.cl.Unitpercentage and indexPlan compliance95.9%98.7%EstimatedWith improvementsProgram NPV100102Supply onlySupply and equipment
At Yauliyacu, modeled improvements would raise compliance from 95.9% to 98.7%. In another study, including equipment uncertainty alongside supply increased NPV by 2%. Omission also costs: in panel caving cases, simulated NPV fell 35% to 49% below theoretical estimate.
Estudios separados hallaron que modelar laincertidumbre operativa aumentó el seguimiento delos planesCumplimiento potencial del plan en Yauliyacu e índice de VPN de un programa para un complejo cuprífero.Made for Dorin Aliendre, by HanademiFuentes: gestionrepo.unmsm.edu.pe.; sage.cnpereading.com.; dataciencia.anid.gob.cl.Unidadporcentaje e índiceCumplimiento del plan95,9 %98,7 %EstimadoCon mejorasVPN del programa100102Solo suministroSuministro y equipos
En Yauliyacu, las mejoras modeladas elevarían el cumplimiento de 95,9% a 98,7%. En otro estudio, incluir incertidumbre de equipos además de suministro aumentó 2% el VPN. La omisión también cuesta: en casos de panel caving, el VPN simulado quedó entre 35% y 49% bajo la estimación teórica.
Mine geometry tests every planTerraced benches and winding haul roads extend across a large open pit.Sources: Digital Twins & IoT Are Powering the Future of Mining Operations. blog.bentley.com.
Benches, haul roads, and terrain show why adaptive planning must represent multiple operating constraints.
La geometría minera pone a prueba cada planBancos escalonados y caminos de acarreo sinuosos se extienden por un gran tajo abierto.Fuentes: Digital Twins & IoT Are Powering the Future of Mining Operations. blog.bentley.com.
Los bancos, caminos de acarreo y el terreno muestran por qué la planeación adaptativa debe representar múltiples restricciones operativas.
Fleet coordination raised one mine’s dailyoutput from 8,300 to 11,200 tonnesAverage daily production before and after a Dispatch evaluation at a Peruvian underground mine.Made for Dorin Aliendre, by HanademiSources: tesis.pucp.edu.pe.Unittonnes per day11.2With Dispatch8.3Before
Dispatch already works with the raw material a twin needs: position, condition, and equipment assignment. In this Peruvian evaluation, average daily production rose from 8,300 to 11,200 tonnes. The fleet did not increase significantly. The result came from better coordinating existing assets.
Coordinar la flota elevó la producción diariade una mina de 8.300 a 11.200 toneladasProducción diaria promedio antes y después de una evaluación de Dispatch en una mina subterráneaperuana.Made for Dorin Aliendre, by HanademiFuentes: tesis.pucp.edu.pe.Unidadtoneladas por día11,2Con Dispatch8,3Antes
Dispatch ya trabaja con la materia prima que necesita un gemelo: posición, estado y asignación de equipos. En esta evaluación peruana, la producción diaria promedio subió de 8.300 a 11.200 toneladas. La flota no aumentó significativamente. El resultado vino de coordinar mejor los activos existentes.
Dispatch coordinates the fleetTwo haul trucks move along a mine road beside piles of rock.Sources: Exxaro and Wabtec Boost Coal Operation Throughput | GE Vernova. gevernova.com.
Dispatch gains depend on coordinating large haul trucks as one operating system.
Dispatch coordina la flotaDos camiones de acarreo avanzan por un camino minero junto a pilas de roca.Fuentes: Exxaro and Wabtec Boost Coal Operation Throughput | GE Vernova. gevernova.com.
Las mejoras de dispatch dependen de coordinar grandes camiones de acarreo como un solo sistema operativo.
Perth coordinates 17 mines andapproximately 2,000 km of railwayAssets coordinated by Rio Tinto's operations center and associated railway extension in Pilbara.Made for Dorin Aliendre, by HanademiSources: Rio Tinto. (2023). Mine of the Future and operations centre.; Rio Tinto. (2019). Rio Tinto's AutoHaul train systemreceives full safety accreditation.Unitassets and kilometresAssets coordinated174MinesPortsRail network2K1.7KCoordinated from PerthAutoHaul
The Perth center coordinates 17 mines, 4 ports, and approximately 2,000 kilometres of railway. AutoHaul received full approval in 2019 to operate over approximately 1,700 kilometres. This infrastructure makes dispatch and remote operations the most mature ground for a system-level twin.
Perth coordina 17 minas y cerca de 2.000km de ferrocarrilActivos coordinados por el centro operativo de Rio Tinto y extensión ferroviaria asociada en Pilbara.Made for Dorin Aliendre, by HanademiFuentes: Rio Tinto. (2023). Mine of the Future and operations centre.; Rio Tinto. (2019). Rio Tinto's AutoHaul train systemreceives full safety accreditation.Unidadactivos y kilómetrosActivos coordinados174MinasPuertosRed ferroviaria2K1,7KCoordinada desde PerthAutoHaul
El centro de Perth coordina 17 minas, 4 puertos y aproximadamente 2.000 kilómetros de ferrocarril. AutoHaul recibió autorización plena en 2019 para operar sobre unos 1.700 kilómetros. Esta infraestructura vuelve a dispatch y operaciones remotas el terreno más maduro para un gemelo de sistema.
Autonomous trains cover roughly 85% of RioTinto’s remotely coordinated rail networkMade for Dorin Aliendre, by HanademiSources: Rio Tinto. (2023). Mine of the Future and operations centre.; Rio Tinto. (2019). Rio Tinto's AutoHaul train system receivesfull safety accreditation.; Rio and Hitachi Rail STS celebrate AutoHaul achievements - International Mining.UnitRail kilometersRail coordinated from Perthabout 2,000 kmAuthorized AutoHaul networkabout 1,700 kmDistance outside the ratioabout 300 kmAutoHaul share: approximately 85%
Autonomous haulage operates across about five sixths of the rail distance coordinated by the remote operations center, showing dispatch maturity at network scale.
Trenes autónomos cubren cerca del 85% de la redferroviaria coordinada remotamente por Rio TintoMade for Dorin Aliendre, by HanademiFuentes: Rio Tinto. (2023). Mine of the Future and operations centre.; Rio Tinto. (2019). Rio Tinto's AutoHaul train systemreceives full safety accreditation.; Rio and Hitachi Rail STS celebrate AutoHaul achievements - International Mining.UnidadKilómetros ferroviariosFerrocarril coordinado desde Perthcerca de 2.000 kmRed AutoHaul autorizadacerca de 1.700 kmDistancia fuera de la proporcióncerca de 300 kmParticipación de AutoHaul: aproximadamente 85%
El transporte autónomo opera en cerca de cinco sextas partes de la distancia ferroviaria coordinada por el centro remoto de operaciones, lo que muestra la madurez del dispatch a escala de red.
Toromocho reported US$8.5 million inbenefits during its first 45 days.The result does not constitute a controlled comparison or a sector adoption rate.Sources: gestion.pe.
Digital centers can create value quickly when they already receive operational data. Chinalco reported approximately US$8.5 million in benefits during the first 45 days of the Toromocho project controlled from Lima. It is a strong signal, although it remains a figure reported by the company.
Toromocho informó US$8,5 millones enbeneficios durante sus primeros 45 días.El resultado no constituye una comparación controlada ni una tasa sectorial de adopción.Fuentes: gestion.pe.
Los centros digitales pueden crear valor rápidamente cuando ya reciben datos operativos. Chinalco informó cerca de US$8,5 millones en beneficios durante los primeros 45 días del proyecto de Toromocho controlado desde Lima. Es una señal potente, aunque sigue siendo una cifra informada por la compañía.
Vale reported 37 digital projects across 15facilitiesDigital twin initiatives and Brazilian facilities included in Vale's 2020 announcement.Made for Dorin Aliendre, by HanademiSources: Vale. (2020). Vale creates virtual replicas of its operations using digital twins.Unitreported countInitiatives37Facilities15
Vale reported 37 digital twin initiatives across 15 Brazilian facilities. The company expected annual benefits near R$60 million. Scale is relevant because it suggests an operating portfolio, not a single experiment. Even so, the benefit was expected and not an audited comparison between mines.
Vale informó 37 proyectos digitales en 15instalacionesIniciativas de gemelos e instalaciones brasileñas incluidas en el anuncio de Vale de 2020.Made for Dorin Aliendre, by HanademiFuentes: Vale. (2020). Vale creates virtual replicas of its operations using digital twins.Unidadconteo informadoIniciativas37Instalaciones15
Vale informó 37 iniciativas de gemelos en 15 instalaciones brasileñas. La compañía esperaba beneficios anuales cercanos a R$60 millones. La escala es relevante porque sugiere una cartera operativa, no un único experimento. Aun así, el beneficio era esperado y no una comparación auditada entre minas.
Sensors and analytics could reduce miningdowntime by between 30% and 50%.No public multi-mine comparison exists for maintenance costs between equivalentoperations with and without digital twins.Sources: Durrant-Whyte, H., Geraghty, R., Pujol, F., & Sellschop, R. (2015). How digital innovation can improve mining productivity. McKinsey &Company.; More uptime, lower cost: Boosting organizational health in maintenance.
Maintenance has clear economic logic: detect failures before losing production. McKinsey estimated a potential reduction of 30% to 50% in downtime through sensors and analytics. The magnitude reflects broad digital potential and not isolated digital twins.
Sensores y analítica podrían reducir entre30% y 50% el tiempo improductivo minero.No existe una comparación pública multimina del costo de mantenimiento entreoperaciones equivalentes con y sin gemelos digitales.Fuentes: Durrant-Whyte, H., Geraghty, R., Pujol, F., & Sellschop, R. (2015). How digital innovation can improve mining productivity. McKinsey &Company.; More uptime, lower cost: Boosting organizational health in maintenance.
El mantenimiento tiene una lógica económica clara: detectar fallas antes de perder producción. McKinsey estimó una reducción potencial de 30% a 50% del tiempo improductivo mediante sensores y analítica. La magnitud corresponde al potencial digital amplio y no a gemelos digitales aislados.
PETRA reported 1.1% more processedmaterial and 0.4% more recovered materialReported improvements for the dynamic twin MAXTA at Ban Houayxai.Made for Dorin Aliendre, by HanademiSources: PETRA Data Science. (2020). MAXTA digital twin optimisation at Ban Houayxai.; Comisión Chilena del Cobre.(2024). Anuario de estadísticas del cobre y otros minerales.; Comisión Chilena del Cobre. (2024). Base de DatosElectrónica.Unitpercentage improvementThroughput1.1%Recovery0.4%
Ban Houayxai shows the type of result a plant can pursue. PETRA reported 1.1% higher throughput and 0.4% higher recovery with MAXTA. At a large plant, small improvements can have material value. The problem is that it remains an isolated business case.
PETRA informó 1,1% más materialprocesado y 0,4% más material recuperadoMejoras informadas para el gemelo dinámico MAXTA en Ban Houayxai.Made for Dorin Aliendre, by HanademiFuentes: PETRA Data Science. (2020). MAXTA digital twin optimisation at Ban Houayxai.; Comisión Chilena del Cobre. (2024).Anuario de estadísticas del cobre y otros minerales.; Comisión Chilena del Cobre. (2024). Base de Datos Electrónica.Unidadmejora porcentualThroughput1,1 %Recuperación0,4 %
Ban Houayxai muestra el tipo de resultado que una planta puede perseguir. PETRA informó 1,1% más throughput y 0,4% más recuperación con MAXTA. En una planta grande, pequeñas mejoras pueden tener valor material. El problema es que sigue siendo un caso comercial aislado.
Two cases’ 1.1% and 10% output gains didnot exceed 10%–30% estimatesMade for Dorin Aliendre, by HanademiSources: McKinsey & Company. (2020). Inside a mining company's AI transformation.; Durrant-Whyte, H., Geraghty, R., Pujol,F., & Sellschop, R. (2015). How digital innovation can improve mining productivity. McKinsey & Company.; PETRA Data Science.(2020). MAXTA digital twin optimisation at Ban Houayxai.UnitPercent improvementBagdad production, analytics plus operational changes10%15%30%Ban Houayxai throughput, published dynamic-twin case1.1%10%20%Orange ranges show estimated sector potential; colored marks show published results
The Bagdad analytics result reaches the bottom of estimated productivity potential, while the published plant-twin result is about one ninth of the lowest throughput estimate.
Las mejoras de producción de 1,1% y 10% en doscasos no superaron estimaciones de 10%–30%Made for Dorin Aliendre, by HanademiFuentes: McKinsey & Company. (2020). Inside a mining company's AI transformation.; Durrant-Whyte, H., Geraghty, R., Pujol, F.,& Sellschop, R. (2015). How digital innovation can improve mining productivity. McKinsey & Company.; PETRA Data Science.(2020). MAXTA digital twin optimisation at Ban Houayxai.UnidadMejora porcentualProducción de Bagdad, analítica y cambios operativos10%15%30%Throughput de Ban Houayxai, caso publicado de gemelo dinámico1.1%10%20%Los rangos naranjas muestran el potencial sectorial estimado; las marcas muestran resultados publicados
El resultado analítico de Bagdad alcanza el límite inferior del potencial estimado de productividad, mientras el resultado publicado del gemelo de planta equivale aproximadamente a una novena parte de la estimación mínima de throughput.
A sector drop in mining deaths cannotisolate digital models’ safety effectFatalities recorded by ICMM companies between 2019 and 2023, without causal isolation of digital twins.Made for Dorin Aliendre, by HanademiSources: International Council on Mining and Metals. (2024). Safety performance: Benchmarking progress of ICMM company members.;Safety Performance Insights Report - ICMM.Unitfatalities010020030020192020202120222023In 2019, 287 fatalities wererecorded.In 2023, 36 fatalities wererecorded.
ICMM companies recorded 287 fatalities in 2019 and 36 in 2023. The reduction is important, but the series does not separate mines with twins from mines without them. Nor does it control for exposure, activity, or operational changes. For this reason, it cannot become a figure of digital twin effectiveness.
Una caída sectorial de muertes mineras noaísla el efecto de modelos digitalesFatalidades registradas por compañías ICMM entre 2019 y 2023, sin aislamiento causal de gemelosdigitales.Made for Dorin Aliendre, by HanademiFuentes: International Council on Mining and Metals. (2024). Safety performance: Benchmarking progress of ICMM company members.;Safety Performance Insights Report - ICMM.Unidadfatalidades010020030020192020202120222023En 2019 se registraron 287fatalidades.En 2023 se registraron 36.
Las compañías ICMM registraron 287 fatalidades en 2019 y 36 en 2023. La reducción es importante, pero la serie no separa minas con gemelos de minas sin ellos. Tampoco controla exposición, actividad o cambios operativos. Por eso no puede convertirse en una cifra de eficacia del gemelo.
70% fear a shortage of workerswith adequate skills.The figure reflects perception among survey participants at ABB, not the sector's totallabor deficit.Sources: ABB. (2023). Mining's moment: The race is on for the sustainable mines of the future.; Mining's Moment Mining Report Toward Real Progress |Campaigns.
Digital twins shift part of the work from field to remote centers and digital functions. In ABB's mining survey, 70% expressed concern about shortages of workers with adequate skills. Technology does not eliminate mining knowledge. It increases the value of combining it with data, simulation, and control.
El 70% teme una escasez de trabajadorescon capacidades adecuadas.La cifra refleja la percepción de participantes en una encuesta de ABB, no el déficitlaboral total del sector.Fuentes: ABB. (2023). Mining's moment: The race is on for the sustainable mines of the future.; Mining's Moment Mining Report Toward Real Progress |Campaigns.
Los gemelos trasladan parte del trabajo desde terreno hacia centros remotos y funciones digitales. En la encuesta minera de ABB, 70% expresó preocupación por la escasez de trabajadores con capacidades adecuadas. La tecnología no elimina el conocimiento minero. Aumenta el valor de combinarlo con datos, simulación y control.
People complete the systemTwo professionals walk together and converse in a glass-walled office.Sources: Report: Geological Data Management Survey Findings. seequent.com.
Digital twins scale only when teams can align data, decisions, and operations.
Las personas completan el sistemaDos profesionales caminan juntos y conversan en una oficina con paredes de vidrio.Fuentes: Report: Geological Data Management Survey Findings. seequent.com.
Los gemelos digitales escalan solo cuando los equipos pueden alinear datos, decisiones y operaciones.
Copper Mountain suffered roughly 5 days ofdowntime following a ransomware attack.The incident confirms that a digital attack can directly reach mining production.Sources: Copper Mountain Mining Corporation. (2023). Update on ransomware attack.
Operational integration also widens the attack surface. Copper Mountain temporarily suspended its mill after a ransomware attack in December 2022 and restarted in January 2023. The approximate downtime was 5 days. A connected twin must protect data, models, and commands.
Copper Mountain sufrió cerca de 5 días deinterrupción tras un ransomware.El incidente confirma que un ataque digital puede alcanzar directamente la producciónminera.Fuentes: Copper Mountain Mining Corporation. (2023). Update on ransomware attack.
La integración operacional también amplía la superficie de ataque. Copper Mountain suspendió temporalmente su molino tras un ransomware en diciembre de 2022 y reinició en enero de 2023. La interrupción aproximada fue de 5 días. Un gemelo conectado necesita proteger datos, modelos y órdenes.
AVEVA paid almost 5 times Bentley’s pricefor data-management technologyAnnounced value of AVEVA's acquisition of OSIsoft and Bentley's acquisition of Seequent in 2021.Made for Dorin Aliendre, by HanademiSources: Bentley Systems. (2021). Bentley Systems completes acquisition of Seequent.; Bentley Systems. (2023). Going Digital Awards inInfrastructure: Mining and offshore engineering.; AVEVA. (2021). AVEVA completes acquisition of OSIsoft.Sources use different measurement bases; read the comparison directionally, not as one exact scale.UnitUS$AVEVA acquired OSIsoft.$5BBentley acquired Seequent.$1.1B
Bentley paid US$1,050 million for Seequent and gained subsurface geoscience capabilities. AVEVA paid US$5,000 million for OSIsoft and acquired PI System with large operational data volumes. Both purchases strengthen different pieces of the twin. Neither acquisition alone demonstrates comparable results across mines.
AVEVA pagó casi 5 veces el precio deBentley por tecnología para gestionar datosValor anunciado de las adquisiciones de OSIsoft por AVEVA y Seequent por Bentley en 2021.Made for Dorin Aliendre, by HanademiFuentes: Bentley Systems. (2021). Bentley Systems completes acquisition of Seequent.; Bentley Systems. (2023). Going Digital Awards inInfrastructure: Mining and offshore engineering.; AVEVA. (2021). AVEVA completes acquisition of OSIsoft.Las fuentes usan bases de medición distintas; lea la comparación como tendencia, no como una escala exacta.UnidadUS$AVEVA compró OSIsoft$5 mil MBentley compró Seequent$1,1 mil M
Bentley pagó US$1.050 millones por Seequent y obtuvo capacidades geocientíficas del subsuelo. AVEVA pagó US$5.000 millones por OSIsoft y obtuvo PI System con grandes volúmenes de datos operacionales. Ambas compras fortalecen piezas distintas del gemelo. Ninguna prueba por sí sola resultados comparables entre minas.
2 miners disclosed cybersecurityincidents during 2024.The incidents reached exploration and production, though they were not attributed to aspecific digital twin platform.Sources: Northern Minerals Limited. (2024). Cyber security incident update.; Evolution Mining Limited. (2024). Cyber security incident.; 24-06-04 NTUASX Announcement - Cyber Security Breach.
Risk did not end with Copper Mountain. Northern Minerals and Evolution Mining disclosed cybersecurity incidents in 2024. The 2 companies operate in different parts of the mining chain. Connectivity increases the digital twin's value and also potential damage.
2 mineras divulgaron incidentescibernéticos durante 2024.Los incidentes alcanzaron exploración y producción, aunque no se atribuyeron a unaplataforma de gemelo específica.Fuentes: Northern Minerals Limited. (2024). Cyber security incident update.; Evolution Mining Limited. (2024). Cyber security incident.; 24-06-04 NTUASX Announcement - Cyber Security Breach.
El riesgo no terminó con Copper Mountain. Northern Minerals y Evolution Mining divulgaron incidentes cibernéticos en 2024. Las 2 compañías operan en partes distintas de la cadena minera. La conectividad amplía el valor del gemelo y también el daño posible.
Geology, fleet, plant, and maintenanceremain fragmented across 4 domains.Strategy must require open interfaces, traceability, cybersecurity, and synchronizationbefore scaling.Sources: Global Mining Guidelines Group. (2020). Interoperability definitions and roadmap.
A mine can digitalize each area and still fail to build an integrated twin. Fragmented formats separate geology, fleet, plant, and maintenance. These are 4 domains that must share context and operational state. Without that connection, each platform remains its own silo.
Geología, flota, planta y mantenimientosiguen fragmentados en 4 dominios.La estrategia debe exigir interfaces abiertas, trazabilidad, ciberseguridad ysincronización antes de escalar.Fuentes: Global Mining Guidelines Group. (2020). Interoperability definitions and roadmap.
Una mina puede digitalizar cada área y seguir sin construir un gemelo integral. Los formatos fragmentados separan geología, flota, planta y mantenimiento. Son 4 dominios que deben compartir contexto y estado operacional. Sin esa conexión, cada plataforma conserva su propia isla.
In summaryConclusions that should guide a mining strategy for digital twins.Made for Dorin Aliendre, by HanademiGeomechanical models updated 75% faster.Plan variance fell from 22.3% to 4.6%.Dispatch raised daily production to 11,200 tonnes.Vale deployed 37 initiatives across 15 facilities.70% fear a shortage of labor capabilities.
Digital twins already improve concrete decisions in geology, planning, dispatch, and plant operations. The best cases connect real data with operational action. Full transformation is not yet proven because comparable metrics are missing and integration remains fragmented. The next step is to measure common outcomes before scaling.
En resumenLas conclusiones que deben guiar una estrategia minera de gemelos digitales.Made for Dorin Aliendre, by HanademiModelos geomecánicos se actualizaron 75% más rápido.La brecha del plan cayó de 22,3% a 4,6%.Dispatch elevó la producción diaria a 11.200 toneladas.Vale desplegó 37 iniciativas en 15 instalaciones.El 70% teme una escasez de capacidades laborales.
Los gemelos digitales ya mejoran decisiones concretas en geología, planificación, dispatch y planta. Los mejores casos conectan datos reales con una acción operacional. La transformación completa todavía no está demostrada porque faltan tasas comparables y la integración sigue fragmentada. El siguiente paso es medir resultados comunes antes de escalar.

The research behind this deck

Digital twins already improve concrete mining decisions, but transformation remains fragmented. Best results appear where data and operations synchronize; comparable adoption rates, security, throughput, and maintenance are still lacking.

Key findings

The argument

This research is published in English and Spanish. Ver en español

La investigación detrás de esta presentación

Los gemelos digitales ya mejoran decisiones mineras concretas, pero la transformación sigue fragmentada. Los mejores resultados aparecen donde datos y operación se sincronizan; todavía faltan tasas comparables de adopción, seguridad, throughput y mantenimiento.

Hallazgos clave

El argumento

Esta investigación se publica en inglés y español. Read in English

Related researchInvestigación relacionada